Upper Reservoir to Body
-- Install the reservoir -2- into the rubber grommet -3-.
-- Attach the reservoir -2- under the coolant reservoir.
Bolt tightening specification -1- : 9 Nm
Bolt tightening specification -5- : 4.5 Nm
NOTE:
Align the hoses and lines on the connections so that the color markings match up.