Evacuating And Charging Valve, Removing And Installing, Low And High Pressure Side: Installing
WARNING: This page is about a different variant/trim than selected.
Install in reverse order of removal and note the following:
-- Evacuate and charge the refrigerant circuit. Refer to REFRIGERANT CIRCUIT .
-- Operate the A/C system after charging the refrigerant circuit. Refer to A/C SYSTEM, STARTING OPERATION AFTER FILLING REFRIGERANT CIRCUIT .
-- Check the DTC memory and erase any displayed entries using the Vehicle Diagnostic Tester in the "Guided Fault Finding" function.