LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2016 >> S5 Prestige, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 20 (Charging System (Battery, Starter, Generator) & Cruise Control (Battery & Charging) (Coupe)) >> 27 Starter, Generator And Cruise Control >> Battery, Checking >> Visual Inspection

Visual Inspection

WARNING: This page is about a different variant/trim than selected.
WARNING:

Risk Of Injury. Follow All Warning Messages And Safety Precautions. Refer To WARNINGS AND SAFETY PRECAUTIONS .

Before Any Extensive Measurements Are Taken, Visually Inspect The Exterior Of The Battery, The Connections, And The Secure Installation Of The Battery -A-.

CAUTION:
  • An Improperly Secured Battery -A- Can Lead To Damage.
  • Excessive Vibration Due To An Improperly Secured Battery Will Reduce The Battery Service Life, And The Battery Hold-Down Bracket Could Damage The Battery Housing And Lead To Electrolyte Leakage.
  • Make Sure The Battery -A- Is Secure. Tighten The Mounting Bolt To The Tightening Specification, If Necessary.

Visual Inspection Points