Turbocharger, Removing And Installing: Installing
Install In Reverse Order Of Removal And Note The Following:
- Replace the bolts that were tightened with an additional turn after removing them.
- Replace seals, gaskets, O-rings and self-locking nuts after disassembly.
- Coat the turbocharger stud bolts with hot bolt past.
- Hose connections and charge air system hoses must be free of oil and grease before installing.
- Secure all hose connections with hose clamps that match the ones used in series production.
- Add oil to turbocharger through oil feed line connecting piece.
- Used coolant cannot be used again.
-- Install the catalytic converter. Refer to CATALYTIC CONVERTER, REMOVING AND INSTALLING [CYNB ENGINES] and/or CATALYTIC CONVERTER, REMOVING AND INSTALLING [CYMC, CYRB, CYRC, CWPB, DAXB, DAXC, CJEB, CJED, CJEE, CNCD, CNCE, CUHA, CUJA, CNCB, CUHB, DAYB, CYGA, CYNB, CYPA, CYPB, CYYA, CVJA ENGINES] .
-- Check the oil level. Refer to the appropriate Service Information
-- Fill with coolant. Refer to COOLANT, DRAINING AND FILLING [CYMC, CYRB, CYRC, CWPB, DAXB, DAXC, CJEB, CJED, CJEE, CNCD, CNCE, CUHA, CUJA, CNCB, CUHB, DAYB, CYGA, CYNB, CYPA, CYPB, CYYA, CVJA ENGINES] and/or COOLANT, DRAINING AND FILLING [CYNB ENGINES] .
-- Install the engine cover. Refer to ENGINE COVER, REMOVING AND INSTALLING .
Additional procedures. Refer to TURBOCHARGER [CLAB, CLAA, CDUC, CGQB, CKVB, CKVC, CDUD, CPNB, CTCB, CTCC, CVUA, CVUB ENGINES] and/or TURBOCHARGER [CYNB ENGINES] .
- After installing the turbocharger, let the engine idle for approximately one minute without increasing the engine speed. This ensures adequate oil supply to the turbocharger.