LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2016 >> S5 Prestige, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 665 (3.0L - Turbocharger & Supercharger - Engine Code(S): CPNB) >> 21 Turbocharger, Supercharger >> Turbocharger >> Turbocharger, Removing And Installing >> Turbocharger, Removing And Installing >> Installing

Turbocharger, Removing And Installing: Installing

WARNING: This page is about a different car, the 2016 Audi Q5, 2015 Audi Q5, and 2014 Audi Q5. However, it is still accessible from the selected car via links, so may be relevant.

Install in reverse order of removal. Note the following:

Tightening specifications:

NOTE:

Replace the seals and O-rings.

Fill the turbocharger with engine oil at the oil supply line connection.

Secure all hose connections with hose clamps of the same type as those equipped by the factory .

To ensure the turbocharger is supplied with enough oil, let the engine run at idle for approximately 1 minute after installing the turbocharger. Do not increase the engine speed during this time.

-- Electrical connections and wiring routing, refer to appropriate SYSTEM WIRING DIAGRAM.

-- Install the air guide, refer to OVERVIEW - AIR FILTER HOUSING .

-- Install the lock carrier cover, refer to LOCK CARRIER COVER, REMOVING AND INSTALLING .

-- Fill with coolant, refer to COOLANT, DRAINING AND FILLING => Check the coolant level. .

Fig 1: EGR Pipe At Turbocharger - Tightening Sequence
GWWA26-11019Courtesy of AUDI OF AMERICA, LLC