LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2016 >> S5 Prestige, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 665 (3.0L - Turbocharger & Supercharger - Engine Code(S): CPNB) >> 21 Turbocharger, Supercharger >> Turbocharger >> Turbocharger, Removing And Installing >> Turbocharger, Removing And Installing, Vehicles With Engine Code CGQB >> Installing

Turbocharger, Removing And Installing, Vehicles With Engine Code CGQB: Installing

WARNING: This page is about a different car, the 2016 Audi Q5, 2015 Audi Q5, and 2014 Audi Q5. However, it is still accessible from the selected car via links, so may be relevant.

Install in reverse order of removal. Note the following:

Tightening specifications:

NOTE:

Replace the seals and O-rings.

Fill the turbocharger at the oil supply line connections with engine oil.

Secure all hose connections with hose clamps of the same type as those equipped by the factory.

To ensure the turbocharger is supplied with enough oil, let the engine run at idle for approximately 1 minute after installing the turbocharger assembly. Do not increase the engine speed during this time.

-- Electrical connections and wiring routing, refer to appropriate SYSTEM WIRING DIAGRAM.

-- Install the front exhaust pipe, refer to FRONT EXHAUST PIPE, REMOVING AND INSTALLING, VEHICLES WITH ENGINE CODE CGQB .

-- Install the air guide pipe, refer to OVERVIEW - CHARGE AIR SYSTEM .

-- Install the air guide, refer to OVERVIEW - AIR FILTER HOUSING .

-- Fill with coolant, refer to COOLANT, DRAINING AND FILLING and CHECK THE COOLANT LEVEL .

Fig 1: EGR Pipe At Turbocharger - Tightening Sequence
GWWA26-11019Courtesy of AUDI OF AMERICA, LLC