3-Pin Relay/Fuse Carrier, Removing And Installing: Removing
WARNING: This page does not describe the selected car, but rather 13 other vehicles, including the 2017 Audi SQ5, 2017 Audi Q5, 2016 Audi SQ5, 2016 Audi Q5, and 2015 Audi SQ5. However, it is still accessible from the selected car via links, so may be relevant.
-- With the ignition switched off, disconnect the ground cable from the battery, refer to BATTERY, DISCONNECTING AND CONNECTING .
-- Remove the driver side instrument panel cover, refer to Storage Compartments and Covers .
-- Disengage the 3-pin relay/fuse carrier by pressing the retaining springs in the direction of the -arrow- and remove the relay/fuse carrier -1-.
-- Unclip the fuse panel from the relay/fuse carrier.
-- Remove the relay and control modules.
-- Release the retaining clips -arrows- and press the relay carrier -2- back and out of the bracket -1-.
NOTE:
The exact assignment of the 3-pin relay/fuse carrier can be found in the applicable wiring diagram, refer to appropriate SYSTEM WIRING DIAGRAM.