REAR EXPANSION VALVE WITH Hybrid Battery Refrigerant Shut-Off Valve 2 -N517-, REMOVING AND INSTALLING: Installing
Installation is done is reverse order, observe the following:
-- Clean the connection pipe -C- and -E- leading to the evaporator and the expansion valve connections and check for damage.
The expansion valve is available in different versions (same housing but a different control characteristic). Therefore, to ensure the exact allocation.
Follow the instructions for installing the O-rings. Refer to REFRIGERANT CIRCUIT SEALS .
-- Replace the O-ring seals -B- and -F-. Allocate correct version.
-- Coat the O-ring seals lightly with refrigerant oil before installing. Refer to REFRIGERANT CIRCUIT SEALS .
-- Make sure the retaining plate -D- fits correctly on the connection pipes -C- and -E- leading to the evaporator.
-- Tighten the bolts -G-.
- Tightening specification: 10 Nm.
-- Install the refrigerant lines for the battery cooling module in the luggage compartment. Refer to REFRIGERANT LINES FOR BATTERY COOLING MODULE IN LUGGAGE COMPARTMENT, REMOVING AND INSTALLING .
-- Install the remaining removed components.
-- Evacuate the refrigerant circuit and fill it. Refer to USING SERVICE STATION for Hybrid.
-- Turn on the ignition.
-- Check the DTC memory for the Climatronic Control Module -J255- display and control head and erase any displayed malfunctions, if necessary using the Vehicle Diagnostic Tester in the "Guided Fault Finding " function.
-- A/C System, Operating after Filling Refrigerant Circuit. Refer to A/C SYSTEM, STARTING OPERATION AFTER FILLING REFRIGERANT CIRCUIT .
Observe the information regarding operating the A/C system after filling. Refer to A/C SYSTEM, OPERATING AFTER CHARGING .