Engine, removing
WARNING: This page is about a different car, the 2009 Audi A4, 2008 Audi A4, 2007 Audi A4, 2006 Audi A4, and 2005 Audi A4. However, it is still accessible from the selected car via links, so may be relevant.
Special tools, testers and auxiliary items required
- Pry lever 80-200
- Hose Clamps Up to 25 mm dia. 3094
- Drip tray for workshop crane VAS 6208 or V.A.G 1306
- Hose clamp pliers V.A.G 1921
- Step ladder VAS 5085
- Scissor Lift Table VAS 6131 with Support Set VAS 6131/10 and VAS 6131/11
NOTE:
- If engine and transmission are to be separated after removal, the Supplementary Set Audi A6 (C6) VAS 6131/12 will also be required.
Work procedure
NOTE:
- With lock carrier installed, engine is removed downward with transmission and subframe.
- All cable ties which are opened or cut open when removing engine, must be replaced in the same position when installing engine.
- Drained coolant must be stored in a clean container for disposal or reuse.
- Discharge refrigerant circuit Refrigerant R134a - Servicing.
CAUTION:
Observe safety precautions when disconnecting the battery → 27 BATTERY, STARTER, GENERATOR, CRUISE CONTROL
.
- With ignition switched off, disconnect Battery Ground (GND) strap - arrow -.
- Remove rear engine cover - arrows -.
- Remove front engine cover - arrows -.
CAUTION:
Cover cap of expansion tank with rag and open carefully, as hot steam i.e. hot coolant may escape when opening.
- Open cap of coolant expansion tank.
- Remove both front wheels.
- For vehicles with auxiliary heater, remove bolts - arrows - for exhaust pipe of parking heater/auxiliary heater on noise insulation.
- Loosen quick-release fasteners - 1 through 3 - and remove front and rear noise insulation.
- Place drip tray for workshop crane VAS 6208 under engine.
- Disconnect coolant hose - arrow - from oil cooler and drain coolant.
- Disconnect lower right coolant hose from radiator - arrow - and drain residual coolant.
- Remove bolts - arrows - at torque support stop.
- Remove bolts - arrows - for torque support.
NOTE:
- The torque support and torque support stop will later be removed.
- Remove Ground (GND) strap - arrow - from right longitudinal member.
- Disconnect brake booster vacuum hose from grommet - arrow - on bulkhead.
- Remove Ground (GND) strap - arrow - at bulkhead.
- Remove coolant hoses - 1 - and - 2 - at coolant expansion tank.
- Remove coolant expansion tank - arrow -.
- Disconnect electrical connection at Engine Coolant Level (ECL) Warning Switch F66 at bottom of coolant expansion tank.
- Remove coolant hose - arrow - from front coolant line.
- Remove left front coolant hose in engine compartment - arrows -.
- Remove coolant hose - arrow - from front coolant line.
- Disconnect vacuum hose - arrow - to leak detection pump.
NOTE:
- Place a rag under hydraulic lines to catch escaping hydraulic fluid.
Fig 19: Removing Hydraulic Pressure Line At Power Steering Pump & Clamping Off Hydraulic Hose For Power Steering Pump With Hose Clamps
- Remove hydraulic pressure line - 2 - at power steering pump and set it aside on top of longitudinal member.
- Clamp off hydraulic hose - 1 - for power steering pump with a Hose Clamps Up to 25 mm dia. 3094.
- Remove hydraulic hose from power steering pump.
NOTE:
- To prevent damage to the refrigerant lines/hoses, ensure that the lines and hoses are not stretched, kinked or bent.
- Remove bolts - arrows -.
NOTE:
- The refrigerant lines will be removed from air conditioning compressor at a later point in time.
- Remove bolts - arrows -.
- Remove air duct - 1 - and - 2 -.
CAUTION:
Note rules of cleanliness for working on the fuel injection system →
Rules of cleanliness for performing work on fuel injection system .
CAUTION:
Fuel system is under pressure! Before opening the low pressure section of the fuel injection system, wrap a clean rag around the connection and relieve residual pressure by carefully loosening the connection.
- Separate fuel line - arrow - and lay aside.
- Disconnect check valve - 1 - from connection at air duct hose.
- Remove air duct hose, thereby loosening hose clamp - 2 - and opening clips - arrows -.
- Remove pin from spreader clips - arrow -.
- Remove air filter housing.
Fig 25: Removing Vacuum Hose To EVAP Canister At Evaporative Emission (EVAP) Canister Purge Regulator Valve N80
- Remove vacuum hose - arrow - to EVAP canister at Evaporative Emission (EVAP) Canister Purge Regulator Valve N80.
- Remove coolant hose - arrow - to heater core on rear of engine.
Fig 27: Disconnecting Electrical Harness Connector For Oxygen Sensor (O2S) 2 Behind Three Way Catalytic Converter (TWC) G131
- Remove nuts and remove left bracket for harness connectors - 1 - and - 2 - from bulkhead.
- Remove rubber seal - 2 - for plenum chamber cover.
- Remove plenum chamber cover - 1 -.
- Remove nut - 1 - and remove fuse strip on plus wire terminal clamp.
- Disconnect positive wire - 2 - on battery positive terminal.
- Pull positive wire through bulkhead toward front.
- Free up wiring harness lay it aside on engine.
NOTE:
- Ignore - 3 -.
- Pry off both covers - 3 - using a screwdriver.
- Loosen hex-nuts - 4 - by several turns.
- Loosen wiper arm - 2 - from wiper axle by lightly tilting.
- Remove nuts completely and remove wiper arms.
- Disconnect securing clips - 1 - and remove cowl grille - 5 -.
- Remove cover for E-Box in plenum chamber - arrows -.
Fig 32: Using Screwdriver To Pry Off Mounting Bracket And Remove Engine Control Module (ECM) From E-Box
- Using a screwdriver, carefully pry off mounting bracket - arrow - and remove Engine Control Module (ECM) from E-Box.
NOTE:
- Engine Control Module (ECM) remains connected at wiring harness.
- Release retaining hooks - arrows - toward outside and remove retaining bracket.
- Disconnect all electrical harness connectors on connector station - 2 -.
- Remove electrical wire connection - 1 -.
- Disengage locking mechanisms - arrows - and remove secondary relay carrier in E-Box toward top.
- Disengage engine wiring harness at E-Box and bulkhead.
- Set wiring harness on engine and secure Engine Control Module (ECM) against falling down.
- Have a second technician press brake pedal.
CAUTION:
To loosen collar bolt for drive axle, the wheel bearing must not be under load (vehicle must not be standing on its wheels).
- Remove collar bolt - 2 - at left and right drive axles - 1 -.
- Remove heat shield - 1 - for left and right drive axles.
- Remove left and right drive axles from flange shafts of transmission.
NOTE:
- The drive axles will be removed at a later time.
NOTE:
- To prevent damage to the refrigerant lines/hoses, ensure that the lines and hoses are not stretched, kinked or bent.
- Remove bracket for refrigerant lines at right on oil pan - arrow -.
- Remove refrigerant lines at A/C compressor.
- Tie up refrigerant line, that runs to catch reservoir at right of vehicle, to body.
- Seal open connections on A/C compressor using clean plugs.
- Remove bolts and nuts - arrows - uniformly at left and right.
- Remove stabilizer.
- If equipped, disconnect electrical harness connector at Left Front Level Control System Sensor G78.
- Unclip actuator rod for Left Front Level Control System Sensor G78 at bottom on link - arrow -.
- Remove suspension strut from link - arrow -.
- Remove nuts - 1 - and - 2 - for fastening link and guide link.
NOTE:
- The bolts will be removed from the subframe at a later point in time.
- Repeat procedure on opposite side of vehicle.
- Loosen clamping sleeves - arrows -.
- Remove heat shield - A - for drive shaft - arrows -.
- Remove bolts at transmission/drive shaft flange.
- Push drive shaft together with rear final drive. The constant velocity (CV) joints can move axially.
- Lay aside drive shaft on exhaust system.
Prepare scissor lift platform:
- Equip scissor lift platform VAS 6131 with support set for Audi VAS 6131/10 and VAS 6131/11 as follows:
| Platform coordinates | Parts of support set for Audi VAS 6131/10 and VAS 6131/11 | |||
|---|---|---|---|---|
| B4 | /10-1 | /10-4 | /10-5 | /10-11 |
| G4 | /10-1 | /10-4 | /10-5 | /10-12 |
| B11 | /10-1 | /10-2 | /10-5 | /10-8 |
| G11 | /10-1 | /10-2 | /10-5 | /10-8 |
| C15 | /10-1 | /10-2 | /10-5 | /11-2 |
| F15 | /10-1 | /10-3 | /10-5 | /10-7 |
- Install attachments on scissor lift table by hand first.
- Place scissor lift platform VAS 6131 in horizontal position.
- Note bubble level (sight glass) on support platform.
- Drive scissor lift platform VAS 6131 under engine/transmission subassembly.
- Position support elements from VAS 6131/10 at front on engine as shown in illustration.
- Make sure that the threaded spindles are completely installed.
- Position support elements from VAS 6131/10 at left and right on subframe as shown in illustration.
Fig 48: Positioning Support Elements From VAS 6131/10 And VAS 6131/11 At Left/Right On Tunnel Cross Member
- Position support elements from VAS 6131/10 and VAS 6131/11 at left and right on tunnel cross member as shown in illustration.
- Twist all spindles of support elements upward far enough until all support pins make contact at support points.
- Tighten base plates for support elements to 20 Nm on scissor lift platform VAS 6131.
- Remove nuts - A - at bottom on left and right engine mounts.
- Cut through cable ties - arrows - , open starter harness retainer and take electrical harness out.
- Mark installation position of subframe and of both engine mount plates to long members using a felt-tip marker.
- Remove bolts - 1 to 4 - in diagonal sequence and in stages.
- Remove left and right engine mount plate.
NOTE:
- Verify that all hoses and lines between engine, transmission, subframe and body have been disconnected.
- While lowering, carefully guide engine/transmission subassembly with subframe out of engine compartment in order to prevent damage.
Fig 52: Lowering Engine/Transmission Assembly Using Scissor Lift Platform VAS 6131 Only Approx. By Dimension
- First lower engine/transmission assembly using scissor lift platform VAS 6131 only approx. by dimension - a -.
- Dimension - a - = 80 mm.
- Remove bolts at guide link - 1 - and at link - 2 - from subframe.
- Pivot guide link - 1 - and link - 2 - outward.
CAUTION:
Guide link and link must not hang free. Tie up both links on wheel bearing housing - arrows
- as shown in illustration.
- Pivot wheel bearing housing outward and remove drive axle.
- Repeat work procedure on opposite side of the vehicle.
- Disconnect connecting rod - 2 - of shift rod.
- Remove socket head bolt of pivot rod - 1 -.
- Remove nut - arrow - and remove lever from selector shaft.
- Remove clutch slave cylinder - arrow - , do not disconnect lines.
- Tie up clutch slave cylinder together with shift rods.
- Push scissor lift platform VAS 6131 approx. 20 mm back and remove torque support and torque support stop.
- Push scissor lift platform VAS 6131 back into removal position and lower scissor lift platform VAS 6131 completely.
- Push scissor lift platform VAS 6131 with engine/transmission subassembly under vehicle.