LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2016 >> S5 Prestige, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 34 (Suspension, Wheels, Steering) >> 43 - Self-leveling suspension >> Dynamic Ride Control (DRC II) >> DRC II system pressure check

DRC II system pressure check

WARNING: This page does not describe the selected car, but rather 17 other vehicles, including the 2009 Audi S4, 2009 Audi A4, 2008 Audi S4, 2008 Audi RS 4, and 2008 Audi A4. However, it is still accessible from the selected car via links, so may be relevant.

Special tools, testers and auxiliary items required 

Bleed charging device V.A.S 6209/2 

Use only approved oil for the bleeding process.

NOTE:
  • Charging device V.A.S 6209/2 must always be bled at initial use.
  • If charging device V.A.S 6209/2 still shows a pressure greater than 0.5 bar (e.g. from a previous reading), bleeding must not be done.
Fig 1: Bleeding Pressure Gauge And Line Section
GW00019958Courtesy of VOLKSWAGEN UNITED STATES, INC.
NOTE:
  • Illustration shows bleeding process by extracting hydraulic oil with hand vacuum pump VAS 6213

System pressure check is performed on front strut of respective DRC line. 

NOTE:
  • To attach or detach charging device V.A.S 6209/2 , system line to be checked must be locked at central valve to limit the quantity of oil leaked to a minimum and to prevent pressurized central valve from emptying.
Fig 2: Removing/Installing Plastic Cover
GW00019959Courtesy of VOLKSWAGEN UNITED STATES, INC.
Fig 3: Loosening Lock Nut On Line To Be Checked & Screwing In Shut-Off Screw Until It Is Hand Tight
GW00019960Courtesy of VOLKSWAGEN UNITED STATES, INC.
Fig 4: Reading System Pressure At Charging Device V.A.S 6209/2
GW00019961Courtesy of VOLKSWAGEN UNITED STATES, INC.
Fig 5: Locating Lock Nut On Line To Be Checked & Screwing In Shut-Off Screw Until It Is Hand Tight
GW00019960Courtesy of VOLKSWAGEN UNITED STATES, INC.
Fig 6: Reading System Pressure At Charging Device V.A.S 6209/2
GW00019961Courtesy of VOLKSWAGEN UNITED STATES, INC.
NOTE:
  • Pressure increase at charging device V.A.S 6209/2 occurs slowly and takes approx. 2 minutes. DRC system pressure can only be read when V.A.S 6209/2 needle has finally come to a stop.
Fig 7: Locating Lock Nut On Line To Be Checked & Screwing In Shut-Off Screw Until It Is Hand Tight
GW00019960Courtesy of VOLKSWAGEN UNITED STATES, INC.
Fig 8: Disconnecting Charging Device V.A.S 6209/2 And Installing Dust Cap
GW00019961Courtesy of VOLKSWAGEN UNITED STATES, INC.
Fig 9: Locating Lock Nut On Line To Be Checked & Screwing In Shut-Off Screw Until It Is Hand Tight
GW00019960Courtesy of VOLKSWAGEN UNITED STATES, INC.
NOTE:
  • Small oil leak which results from connecting or disconnected charging device V.A.S 6209/2 at connection is not critical. Avoid repeating measurements because a small quantity of oil is removed from the system every time V.A.S 6209/2 is connected. Every connection results in a pressure decrease of approx. 0.3 bar from the previous reading. In this way, multiple repeats of measurements cause pressure to fall below minimum level or malfunction.
Fig 10: Removing/Installing Plastic Cover
GW00019959Courtesy of VOLKSWAGEN UNITED STATES, INC.

DRC system pressure values 

Pressure values are based on a reference temperature of 20°C.