Removing
- Follow the guidelines for a clean working environment when working on the fuel system. Refer to CLEAN WORKING CONDITIONS AND FUEL SYSTEM WORK INSTRUCTIONS .
- Always follow these rules before and during work.
-- Remove the engine cover. Refer to ENGINE COVER, REMOVING AND INSTALLING .
-- Remove the intake manifold upper section. Refer to INTAKE MANIFOLD UPPER SECTION, REMOVING AND INSTALLING .
Ignore -items 2 and 3- .
-- Remove the bolts -arrows- and the high pressure line protective plate.
-- Remove the union nuts -1 and 4- and remove the high pressure line.
-- Disconnect the connector -2- from the EGR Cooler Pump -V400- .
-- Remove the bolts -1- .
-- Remove the connectors -1 and 2- from the bracket.
-- Press the connecting rod -1- off the Intake Flap Motor -V157- .
-- Disconnect the connector -3- on the Intake Flap Motor -V157- .
-- Remove bolts -2 and 4- and remove Intake Flap Motor -V157- .
-- Disconnect the glow plug connectors for cylinders 1, 2 and 3.
-- Press the electrical wiring harness to the side.
Ignore -Item 1- .
Seal the intake channels in cylinder head using a clean rag.
-- Remove the bolts -arrows- .
-- Press the coolant pipe to the side and remove the intake manifold lower right section.