Overview - Turbocharger
WARNING: This page is about a different car, the 2012 Volkswagen Touareg and 2011 Volkswagen Touareg. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
Hose connections are secured by clamps and retaining clips.
Charge air system must be properly sealed.
Replace the self-locking nuts.
After installing turbocharger, let engine run at idle for approximately 1 minute and without increasing engine speed. This ensures that charger is lubricated.
- Pipe
- Engine codes CASA and CASD: EGR recirculation bypass valve
- Engine code CATA: By-pass valve for the exhaust gas recirculation auxiliary cooler
- With catalytic converter
- Seal
- Replace
- Intermediate Flange
- Bolt
- 25 Nm
- O-Ring
- Replace
- Bolt
- 9 Nm
- Oil Supply Line
- From the cylinder block
- Bolt
- 9 Nm
- Seals
- Replace
- Banjo Bolt
- 15 Nm
- Right Air Guide Pipe
- Air Guide Hose
- From the turbocharger to the right air duct pipe
- Bolt
- 9 Nm
- Air Duct Hose Connection
- From the Mass Airflow Sensor -G70- to the turbocharger
- Must be free of oil and grease before installing
- Exhaust Gas Temperature Sensor 1 -G235-
- 45 Nm
- Lubricate with hot bolt paste. Refer to the Parts Information for hot bolt paste.
- For removing and installing on engine code CATA. Refer to Exhaust Gas Temperature Sensor 1 -G235-, REMOVING AND INSTALLING .
- Seal
- Replace if damaged
- Bolt
- 9 Nm
- Turbocharger Heat Shield
- Turbocharger
- Removing and installing. Refer to TURBOCHARGER, REMOVING AND INSTALLING .
- With Turbocharger Control Module 1 -J724-
- Bolt
- 30 Nm + 90° (1 /4 turn) additional turn
- Replace
- Lubricate with hot bolt paste. Refer to the Parts Information for hot bolt paste.
- Gasket
- Replace
- Pre-Catalytic Converter
- Nut
- 23 Nm
- Replace
- Lubricate with hot bolt paste. Refer to the Parts Information for hot bolt paste.
- Seal
- Replace
- Bolt
- Pre-tighten to 7 Nm.
- 9 Nm
- Lubricate with hot bolt paste. Refer to the Parts Information for hot bolt paste.
- Oil Return Line Upper Section
- From the turbocharger
- Bolts
- 9 Nm
- Oil Return Line Lower Section
- To cylinder block
- O-Rings
- Replace
- Bolt
- 9 Nm
- Seal
- Replace
- Intermediate Pipe
- Removing and installing. Refer to LEFT INTERMEDIATE PIPE, REMOVING AND INSTALLING for left side and. Refer to RIGHT INTERMEDIATE PIPE, REMOVING AND INSTALLING for right side.
- Bolt
- 30 Nm + 90° (1 /4 turn) additional turn
- Replace
- Lubricate with hot bolt paste. Refer to the Parts Information for hot bolt paste.
- Seal
- Replace
- Bolt
- 25 Nm
- Bolt
- 5 Nm + 90° additional turn
- Replace