Part II
Part I. Refer to PART I .
- Support
- Turbocharger
- Removing and installing. Refer to TURBOCHARGER, REMOVING AND INSTALLING .
- O-ring
- Always replace after removing.
- Coat with engine oil
- Line
- For the crankcase ventilation
- Bolt
- 9 Nm
- Depending on the version a bolt or a threaded connection with a connected hose is installed.
- Heated Oxygen Sensor -G39-
- Removing and installing. Refer to HEATED OXYGEN SENSOR, REMOVING AND INSTALLING .
- O-ring
- Always replace after removing.
- Coat with engine oil
- Oil Supply Line
- Bolt
- 9 Nm
- O-ring
- Always replace after removing.
- Coat with engine oil
- Bolt
- 9 Nm
- Bolt
- 30 Nm
- Coat the with hot bolt paste.
- Heat Shield
- Bolt
- 9 Nm
- Coolant Supply Line
- O-ring
- Always replace after removing.
- Coat with engine oil
- Bolt
- 9 Nm
- O-ring
- Always replace after removing.
- Coat with coolant
- Bolt
- 20 Nm + 90°
- Always replace after removing.