Overview - Balance Shaft Drive Chain
- Guide Pin
- 20 Nm
- Guide Rail
- For the timing chain
- Balance Shaft Drive Chain
- Removing and installing. Refer to Balance Shaft Drive Chain, Removing and Installing
- Guide Pin
- 20 Nm
- Tensioning Rail
- For the drive chain for the balance shafts
- Balance Shaft
- Must be replaced after removing
- Exhaust side
- Lubricate the bearing with engine oil
- Replacing. Refer to BALANCE SHAFT, REMOVING AND INSTALLING, EXHAUST SIDE .
- Guide Pin
- 20 Nm
- Guide Rail
- For the timing chain
- Chain Tensioner
- 85 Nm
- Coat the seal with sealant
- Three Stage Chain Sprocket
- Installation position. Refer to Three Stage Chain Sprocket - Installed Position .
- O-ring
- Lubricate with engine oil
- Mounting Pin
- Lubricate with engine oil
- Installation position. Refer to Mounting Pins - Installation Position .
- Intermediate Sprocket
- The intermediate sprocket must be replaced if the bolt -item 15- is loosened.
- Washer
- Bolt
- Tightening sequence. Refer to Intermediate Sprocket Tightening Sequence .
- Always replace after removing
- The intermediate sprocket -item 13- must be replaced if the bolt is loosened.