Overview - Timing Chain Cover, Engine With Two Camshaft Adjusters
WARNING: This page is about a different variant/trim than selected.
- Bolts
- Tightening Specifications:
- Steel bolt 9 Nm
- Aluminum bolt 4 Nm +45°
- Aluminum bolt: Always replace after removal
- Tightening Specifications:
- Exhaust Camshaft Adjustment Valve 1 -N318-
- Always replace the O-ring, refer to -item 9-.
- Removing and installing. Refer to CAMSHAFT ADJUSTMENT VALVE 1 -N205-, REMOVING AND INSTALLING .
- Seals
- Always replace after removing
- Coat with oil before assembly
- Upper Timing Chain Cover
- Removing and installing. Refer to TIMING CHAIN COVER, REMOVING AND INSTALLING, ENGINE WITH TWO CAMSHAFT ADJUSTERS .
- Seal
- Always replace if damaged
- Cap
- Bolt
- Tightening sequence. Refer to Fig 2.
- Seal
- Always replace if damaged
- O-ring
- Always replace after removing
- Coat with oil before assembly
- Not Installed
- Engine
- Alignment Pins
- Centering the cover
- Lower Timing Chain Cover
- With gasket
- Replacing. Refer to LOWER TIMING CHAIN COVER, REPLACING .
- Seal
- For the vibration damper
- Replacing. Refer to VIBRATION DAMPER SEAL, REPLACING .
- Plugs
- Always replace after removing
- Bolt
- O-ring
- Always replace after removing
- Coat with oil before assembly
- Oil Dipstick Tube
- Bolt
- 9 Nm
- Camshaft Adjustment Valve 1 -N205-
- Always replace the O-ring, refer to -item 9-.
- Removing and installing. Refer to CAMSHAFT ADJUSTMENT VALVE 1 -N205-, REMOVING AND INSTALLING .
-- Tighten the bolts -1 to 6- in the sequence shown to 9 Nm.
- Replace the bolts that were tightened with an additional turn after removing them.
-- Tighten The Bolts In The Steps Shown In The Sequence (15 Bolt):
| Step | Bolts | Tightening Specification/Additional Turn |
|---|---|---|
| 1. | -1 to 15- | Install by hand all the way |
| 2. | -1 to 15- | 8 Nm |
| 3. | -1, 2, 4, 5- and -7 to 15- | 45° additional turn |
| 4. | -3 and 6- | After installation of the vibration damper a 45° additional turn |
- Replace the bolts that were tightened with an additional turn after removing them.
-- Tighten The Bolts In The Steps Shown In The Sequence (8 Bolt):
| Step | Bolts | Tightening specification/additional turn |
|---|---|---|
| 1. | -1 to 8- | Install by hand all the way |
| 2. | -1 to 8- | 8 Nm |
| 3. | -2 and 3- and -5 to 8- | 45° additional turn |
| 4. | -1 and 4- | After installation of the vibration damper a 45° additional turn |