LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2015 >> Q3 Prestige >> Repair and Diagnosis >> External Pages >> Different car >> Section 7 (Crankshaft & Cylinder Block (Ea 888 Generation III) (2017-2018)) >> 13 Crankshaft, Cylinder Block >> Cylinder Block, Belt Pulley Side >> Overview - Cylinder Block, Belt Pulley Side

Overview - Cylinder Block, Belt Pulley Side

WARNING: This page is about a different car, the 2018 Audi Q3 Quattro, 2018 Audi Q3, 2017 Audi Q3 Quattro, and 2017 Audi Q3. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Cylinder Block, Belt Pulley Side
GWWA13-10965Courtesy of AUDI OF AMERICA, LLC
  1. Ribbed Belt
    • Check for wear
    • Do not kink
    • Ribbed belt routing. Refer to Fig 2.
    • Before removing, mark the running direction using chalk or a felt-tip pen.
    • When installing, make sure it is seated correctly on the belt pulleys
    • Removing and installing. Refer to RIBBED BELT, REMOVING AND INSTALLING .
  2. Ribbed Belt Tensioner
  3. Bolt
    • 8 Nm + 45°
    • Always replace after removing
  4. Bolt
    • 150 Nm + 90°
    • Always replace after removing
    • Use the Counterhold - Vibration Damper :T10355  to loosen and tighten
    • Coat the O-ring with engine oil
  5. O-ring
    • Not a replacement part; supplied with the bolt
  6. Vibration Damper
  7. Sub-Assembly Bracket
  8. Seal
    • Always replace after removing
  9. Bolt
    • Tightening Specifications and Sequence. Refer to  4.
    • Always replace after removing
  10. Bolt
  11. Generator
  12. Alignment Sleeves
    • For the A/C compressor
  13. A/C Compressor
  14. Bolt
Fig 2: Damper, Tensioner, Generator And A/C Compressor
GWWA13-10905Courtesy of AUDI OF AMERICA, LLC
  1. Vibration Damper
  2. Ribbed Belt Tensioner
  3. Generator
  4. A/C Compressor
GWWA13-10887Courtesy of AUDI OF AMERICA, LLC

-- Mount the sub-assembly bracket and then install the bolts -4- first.

-- Tighten the bolts in the steps shown in the sequence:

Step Bolts Tightening specification/additional turn
1. -1 through 5- Install by hand all the way
2. -1 through 5- 20 Nm
3. -1 through 5- 90° additional turn