Installation Sequence:
WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2017 Audi A5 Quattro, 2016 Audi A5 Quattro, 2015 Audi A5 Quattro, 2014 Audi A5 Quattro, and 2013 Audi A5. However, it is still accessible from the selected car via links, so may be relevant.
-- Insert the spring -1- in the groove.
-- Insert the lower plate -3- in the groove.
-- Insert the upper plate -2- in the groove.
- Install the upper joint of the 3-part oil scraping ring 120° offset to the neighboring compression ring
-- Place the bearing shells centrally into connecting rod and connecting rod bearing cap.
- Dimension -a- = dimension -a-.