Overview - Battery, Coupe
WARNING: This page does not describe the selected car, but rather 23 other vehicles, including the 2017 Audi S5, 2017 Audi A5 Quattro, 2016 Audi S5, 2016 Audi A5 Quattro, and 2015 Audi S5. However, it is still accessible from the selected car via links, so may be relevant.
- Battery
- In The Luggage Compartment In The Spare Wheel Well
- Removing And Installing. Refer To BATTERY, REMOVING AND INSTALLING .
- Screw
- Nut
- 6 Nm
- Fuse Panel A -SA-
- Disconnecting and Connecting. Refer To BATTERY, REMOVING AND INSTALLING .
- Removing and installing. Refer To FUSE PANEL A -SA- IN LUGGAGE COMPARTMENT, REMOVING AND INSTALLING .
- Positive Terminal Cover
- Retaining Bracket
- For The Vehicle Tool Kit Cover
- Screw
- 18 Nm
- Mount
- For The Tool Kit
- Cover
- For The Tool Kit
- Nut
- For The Vehicle Tool Kit Cover
- Tightening Specification. Refer To OVERVIEW - LUGGAGE COMPARTMENT FLOOR .
- Screw
- 18 Nm
- Negative Terminal Cover
- Nut
- 6 Nm
- Ground Cable with Battery Monitoring Control Module -J367-
- Disconnecting and Connecting. Refer To BATTERY, DISCONNECTING AND CONNECTING .
- Removing and installing. Refer To GROUND CABLE WITH BATTERY MONITORING CONTROL MODULE -J367-, REMOVING AND INSTALLING .
- Screw
- Nut
- 20 Nm
- Central Venting System Hose
- Screw
- 18 Nm
- Bracket