Charge Air System, Checking For Leaks: Assembling
Assemble in the reverse order of removal. Note the following:
- Secure all hose connections with hose clamps that match the ones used in series production. Refer to the Parts information.
-- Release the pressure in the test circuit by removing the hose coupling before removing the adapter.