Fastener Tightening Specifications
| Component |
Bolt Size |
Nm |
| Air Guide Pipe to Bracket |
- |
10 |
| Bracket for Turbocharger |
- |
30 |
| Charge Air Pipe |
- |
10 |
| Charge Air Pressure Sensor |
- |
5 |
| Connection |
- |
9 |
| Coolant Return Line |
| |
- |
9 |
| |
- |
35 |
| Coolant Supply Line |
| |
- |
9 |
| |
- |
35 |
| Fastening Strip, Nut |
- |
30 |
| Mount for Charge Air Cooler |
- |
5 |
| Oil Supply Line |
|
- |
30 |
| |
- |
9 |
| Oil Return Line |
- |
9 |
| Right Air Guide Pipe to the Oil Pan |
- |
10 |
| Turbocharger Vacuum Diaphragm |
| Bolt |
- |
10 |
| Nut |
- |
9 |
| Turbocharger Recirculating Valve |
- |
7 |
| Wastegate Bypass Regulator Valve |
- |
3 |
Turbocharger - Tightening Sequence
Courtesy of AUDI OF AMERICA, LLC
-- Tighten the bolts -1 through 5- in 4 stages as follows:
-- 1. Tighten the bolts to 5 Nm.
-- 2. Tighten the bolts to 12 Nm.
-- 3. Tighten the bolts to 16 Nm.
-- 4. Tighten the bolts to 25 Nm.