Turbocharger Overview: Notes
Secure all hose connections using hose clamps appropriate for the model type.
Hose connections and charge air system hoses must be free of oil and grease before installing. On connector couplings, the seal and sealing surfaces must only be lightly oiled. Refer to AIR GUIDE PIPES AND HOSES WITH CONNECTOR COUPLING .
Charge air system must be properly sealed.
Replace the self-locking nuts.
Hose clip pliers VAS 6362 or hose clip pliers V.A.G 1921 are recommended for installing spring clamps.
Add oil to turbocharger through oil feed line connecting piece.
After installing turbocharger, let engine idle for approximately 1 minute without increasing engine speed. This ensures adequate oil supply to the turbocharger.
Pay attention to the rules of cleanliness. Refer to CLEAN WORKING CONDITIONS .