LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2009 >> Q7 4.2 >> Repair and Diagnosis >> External Pages >> Different car >> Section 6 (3.0L - Cooling System - Engine Code(S): CJTB, CJTC, CNAA, CJWB, CJWC, CJWE, CTWA, CTWB) >> 19 Cooling System >> COOLANT PIPE AND After-Run Coolant Pump -V51- >> Upper Coolant Pipe, Removing And Installing >> Installing

Upper Coolant Pipe, Removing And Installing: Installing

WARNING: This page is about a different car, the 2015 Audi Q7, 2014 Audi Q7, 2013 Audi Q7, 2012 Audi Q7, and 2011 Audi Q7. However, it is still accessible from the selected car via links, so may be relevant.

Install in reverse order of removal. Note the following:

NOTE:

Replace the O-rings.

-- Clean and smooth the O-ring sealing surface.

-- Coat the O-ring with coolant and slide it onto the coolant pipe.

-- Connect the coolant hose to the coupling. Refer to Figure.

-- Install the high pressure line and the right intake manifold lower section. Refer to INTAKE MANIFOLD LOWER SECTION WITH FUEL RAIL, REMOVING AND INSTALLING and HIGH PRESSURE LINE, REMOVING AND INSTALLING .

-- Fill with coolant. Refer to COOLANT, DRAINING AND FILLING .