Vehicles with 5.2l FSI engines
Removing
- Remove engine → 10 - Engine - Assembly .
- Leave engine with transmission installed on the scissor lift platform VAS 6131.
- Twist spindles of support elements left and right at subframe completely downward.
- Remove both base plates of attachments for subframe from scissor lift table VAS 6131.
- Remove attachments.
- Remove subframe to the side.
- Remove bolts - arrows - from After-Run Coolant Pump V51.
NOTE:
- The coolant hoses and electrical harness connectors remain connected.
- Disconnect electrical harness connector - arrow - at right engine mount.
- Remove bolts - 1 3 -.
- Remove engine support with engine mount.
- Remove ground (GND) wire - 4 - from starter.
- Disconnect electrical wires - 2 - and - 3 - from starter.
- Unscrew bolts - 1 - and - 5 - and remove starter.
Installing
Installation is performed in reverse order of removal, noting the following:
- Install engine → 10 - Engine - Assembly .
Tightening torques
| Component | Nm | |
| Starter to transmission | M10x40 | 45 |
| M10x135 1) | 65 | |
| Terminal B+ to starter | 16 | |
| Ground (GND) wire to starter | 22 | |
| Engine support to cylinder block | 40 | |
| After-Run Coolant Pump V51 to bracket | 8 | |
|
||