Cylinder bank 1 (right):
WARNING: This page is about a different variant/trim than selected.
Follow sequence - 1 to 20 - when loosening cylinder head bolts.
NOTE:
- Arrow points in direction of travel.
Tightening sequence cylinder bank 1 (right):
NOTE:
- Arrow points in direction of travel.