6.0L MPI
Special tools, testers and auxiliary items required
- Hose clamp pliers V.A.G 1921
- Workshop crane drip tray VAS 6208
Removing
- With ignition switched off, disconnect battery Ground (GND) wire → Battery, Disconnecting and Connecting .
- Drain coolant → 19 - COOLING SYSTEM .
- Move lock carrier to service position → 50 - BODY - FRONT .
Fig 3: Mass Air Flow (MAF) Sensor G70 Electrical Connector, Upper Part Of Air Filter Housing Connections, Intake Manifold Air Duct Hose & Bolts
- Disconnect connector - 1 - for Mass Air Flow (MAF) Sensor G70.
- Detach air hose - 4 - at intake manifold.
- Detach bracket for electrical connectors - 2 - and - 3 - at top section of air cleaner housing.
- Remove screws - arrows -.
- Remove right upper section of air filter housing.
- Remove air duct - 1 -.
- Remove screws - arrows -.
- Remove lower section of right air cleaner housing.
NOTE:
- Place a rag under separating point to catch escaping coolant.
- Detach coolant hose - arrow - at right on engine.
Fig 6: Pulling Engine Cover At Rear And Middle Upward And Off & Pulling Engine Cover Forward And Off Of Intake Manifold
- Next, carefully remove engine cover at rear and center upward - arrows 1 -.
- Then remove engine cover forward from intake manifold - arrows 2 -.
- To loosen the poly V-belt, apply pressure to tensioner in direction of the - arrow - using a 30 mm box-end wrench.
- Detach ribbed belt from generator pulley.
- Release tensioner.
- Place Workshop Crane Drip Tray VAS 6208 under engine.
- Detach coolant hose (front) at auxiliary radiator - arrow - and allow coolant to drain off.
- Remove bolts - 1 - and - 2 -.
- Detach coolant hoses - arrows -.
- Remove bolts - 1 - and - 2 -.
- Remove auxiliary radiator.
- Detach wire - 1 - at generator.
- Disconnect electrical connector - 2 -.
- Remove screws - arrows -.
NOTE:
- If alternator sticks in holder, turn bolt back in again down to the last 2 turns.
- Tap carefully on bolt heads with flat side of hammer to release threaded bushings of generator mount.
- Pivot the alternator slightly down to left.
NOTE:
- Two technicians are required for remaining procedures for removing generator.
CAUTION:
Coolant will drain out.
- Detach coolant hose - 2 - from hose flange at generator.
- Mark installation position of hose flange on generator.
- Remove bolt - 1 - and remove bracket.
- Detach both hose flanges from generator.
- Remove generator.
Installing
Install in reverse order of removal, observing the following:
NOTE:
- Replace O-ring
- Secure all hose connections using standard hose clamps .
- Slightly drive back sleeves for retaining bolts in order for easier installation of generator.
NOTE:
- Tight sleeves for generator mount must be made smooth-running, otherwise clamping force of sleeve is too little despite correct torque.
- First fit poly V-belt onto pulley for vibration damper, then onto the remaining pulleys, and lastly onto the tensioning roller.
NOTE:
- When installing poly V-belt, make sure it is properly seated on pulleys.
- Install right auxiliary radiator → 19 - COOLING SYSTEM .
- Connect battery. Required actions → Battery, Disconnecting and Connecting .
- Fill coolant → 19 - COOLING SYSTEM .
- Start engine and check belt routing.
- Install lock carrier with attachments → 50 - BODY - FRONT .
- Install front bumper cover → 63 - BUMPERS .
Tightening Specifications
| Component | Nm |
|---|---|
| Hose flange to generator | 10 |
| Terminal 30/B+ to generator | 16 |
| Generator to engine | 23 |