LEMON Manuals: Even more car manuals for everyone
Home >> Acura >> 2010 >> TL FWD V6-3.5L >> Repair and Diagnosis >> Transmission and Drivetrain >> Automatic Transmission/Transaxle >> Service and Repair >> Overhaul >> Valve Body >> Secondary Valve Body Disassembly, Inspection, and Reassembly

Secondary Valve Body Disassembly, Inspection, and Reassembly




Secondary Valve Body Disassembly, Inspection, and Reassembly

1. Clean all parts thoroughly in solvent, and dry them with compressed air. Blow out all passages.

2. Do not use a magnet to remove the check balls, it may magnetize the check balls.

3. Inspect the secondary valve body for scoring and damage.

4. Check all valves for free movement. If any fail to slide freely, refer to the valve body repair procedure Valve Body Repair.

5. Coat all parts with ATF during assembly.






SPRING SPECIFICATIONS