LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2011 >> Matrix AWD L4-2.4L (2AZ-FE) >> Repair and Diagnosis >> Powertrain Management >> Emission Control Systems >> Positive Crankcase Ventilation >> Positive Crankcase Ventilation Valve >> Service and Repair >> Installation

Installation





2AZ-FE EMISSION CONTROL: PCV VALVE: INSTALLATION

1. INSTALL VENTILATION VALVE SUB-ASSEMBLY

(a) Apply adhesive to 2 or 3 threads of the ventilation valve.





Adhesive:

Toyota genuine adhesive 1324, three bond 1324 or equivalent

(b) Using a 22 mm deep socket wrench, install the ventilation valve.





Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)

2. CONNECT NO. 2 VENTILATION HOSE

(a) Connect the No. 2 ventilation hose.





3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation

4. INSPECT FOR OIL LEAK