Pinpoint Test 2
PINPOINT TEST 2: THE INSTRUMENT CLUSTER IS INOPERATIVEStep 1 - 2:
Step 3:
Normal Operation
The instrument cluster receives the START/RUN power from circuit (B/LG). The RUN/ACC power is from circuit (B/P) and the keep-alive power from circuit (O/LG). The instrument cluster grounding is accomplished through circuit (B/W) and the bulb grounding is accomplished through circuit (B).
Possible Causes
- circuit (B) open
- circuit (O/LG) open
- circuit (B/W) open
- circuit (B/P) open
- circuit (B/LG) open
- instrument cluster